Opening Date: August 22, 2025 5:00 PM
Closing Date: September 22, 2025 2:00 PM
The Bidder hereby acknowledges and agrees:
1. To provide all goods, services and construction, as more specifically set out and in accordance with the Owner’s Bid Call Document, including but not limited to the scope of work, specifications, drawings, Addenda (if issued by the Owner), the terms and conditions, etc. stated therein, which are expressly acknowledged and made part of this Contract.
2. This Bid is made without any connections, knowledge, comparison of figures or arrangements with any other company, firm or person making a Bid for the same Work and is in all respects fair and without collusion or fraud.
3. I/WE do hereby Bid and offer to enter into a Contract to do all the Work as specified in the Bid Call Document(s) which shall include all costs but not limited to; freight, duty, currency, etc. in accordance with the prices and terms as submitted by the Bidder herein.
4. If I/WE withdraw this Bid before the formal Contract is executed by the Awarded Bidder for the said Work or Ninety (90) Calendar Days, whichever event first occurs, the amount of the Bid Deposit accompanying this Bid (if applicable to this bid) shall be forfeited to the Owner.
5. If the Bid is accepted, I/WE agree to furnish all required documentation, as required by the Bid Call Document(s) within Ten (10) Calendar Days after notification of Award.
6. I/We acknowledge and agree that any issued Addendum/Addenda forms part of the Bid Call Document.
I/WE (including any related or affiliated entities and any principal thereof) have no unresolved litigation with the Owner.
The Bidder acknowledges and agrees that the addendum/addenda below form part of the Bid Document
Please check the box in the column "I have reviewed this addendum" below to acknowledge each of the addenda.
| File Name | I have reviewed the below addendum and attachments (if applicable) | Pages | |
|---|---|---|---|
| There have not been any addenda issued for this bid. | |||